The operators loads an upper, with counter inserted, onto the heated mould, pulling pincers tension the upper then moulding phase starts: the pad inflating. By heating and pressure counter is activated and the materials (upper, counter and lining) are laminated togheter without defects. Backpart of the upper at this point is moulded and the shape is stabilized. When settled time is dwell, the upper is released while moulds return to start position to allow unloading and new cycle.